Crosbie, R., Runge, K., Brent, C., Korte, M., and Gibbons, T. 2009. An integrated optimisation study of the Barrick Osborne concentrator: Part B–Flotation. In Proceedings of the 10th Mill Operators’ Conference 2009. Melbourne, Victoria: Australasian Institute of Mining and Metallurgy. pp. 189–197.
Diaz, R., Mamani, H., Valery, W., Jankovic, A., Valle, R., and Duffy, K. 2015. Diagnosis of process health, its treat- ment and improvement to maximise plant throughput at Goldfields Cerro Corona. In SAG 2015 Conference Proceedings, Vancouver, BC.
Duffy, K. 2012. Unlocking energy efficiency in the mining process. Efficiency Opportunities (EEO) National Workshop. September 6. Perth: Department of Resources, Energy and Tourism.
Duffy, K., Valery, W., Jankovic, A., and Holtham, P. 2015. Resource efficient mining processes of tomorrow. Presented at the Third International Future Mining Conference, Sydney, Australia, November 4–6.
Foley, M. 2012. In-pit crushing: Wave of the future? Aust. J. Min. (May/June):46–53.
Goldratt, E.M. 1990. The Haystack Syndrome: Sifting Information Out of the Data Ocean. New York: North River Press.
Hart, S., Valery Jr., W., Clements, B., Reed, M., Song, M., and Dunne, R. 2001. Optimisation of the Cadia Hill SAG mill circuit. In SAG 2001 International Conference on Autogenous and Semiautogenous Grinding Technology. Vancouver, BC: University of British Columbia, Department of Mining Engineering.
Hart, S., Rees, T., Tavani, S., Valery, W., and Jankovic, A. 2011. Process integration and optimisation of the Boddington HPGR circuit. In SAG 2011 Conference Proceedings, Vancouver, BC.
Jankovic, A., and Valery, W. 2012. The impact of classifica- tion on the energy efficiency of grinding circuits—The hidden opportunity. Presented at 11th Mill Operators Conference, Hobart, Tasmania, October 23–31.
Koehler, F. 2010. In-pit crushing looms the way into Australia. Mining Magazine Congress.
Lam, M., Jankovic, A., Valery, W., and Kanchibotla, S. 2001. Increasing SAG mill circuit throughput at Porgera gold mine by optimising blast fragmentation. In SAG 2001 Conference Proceedings, Vancouver, BC.
McCaffery, K., Mahon, J., Arif, J., and Burger, B. 2006. Batu Hijau—Controlled mine blasting and blending to opti- mise process production at Batu Hijau. In SAG 2006 Conference Proceedings, Vancouver, BC.
Norgate, T.E., and Haque, N. 2010. Energy and greenhouse gas impacts of mining and mineral processing operations. J. Cleaner Prod. 18(3):266–274.
Norgate, T.E., and Lovel, R.R. 2006. Sustainable water use in minerals and metal production. In Proceedings of Water in Mining. Melbourne, Victoria: Australasian Institute of Mining and Metallurgy. pp. 331–340.
Nunna, V., Suthers, S., Chinthapudi, E., Raynlyn, T., Wills, T., Tsedenbaljie, T., and Douglas, J. 2014. Effect of clas- sification efficiency on Ball Mill capacity for magnetite ores—Phase 1. CSIRO and Metso PTI internal report.
Powell, M., Condori, P., Smit, I., and Valery Jr., W. 2006. The value of rigorous surveys—The Los Bronces experience. In SAG 2006 Conference Proceedings. Vol. 1. Vancouver, BC. pp. 233–248.
Read, N. 2012. Karara project awards key tailings management contract to BIS Industries. Securities Exchange announce- ment and media release. Perth: Gindalbie Metals.
Renner, D., La Rosa, D., DeKlerk, W., Valery, W., Sampson, P., Bonney Noi, S., and Jankovic, A. 2006. Anglogold Ashanti Iduapriem mining and milling process integration and optimization. In SAG 2006 Conference Proceedings, Vol. 1. Vancouver, BC. pp. 249–264.
Runge, K., Tabosa, E., and Holtham, P. 2014. Integrated opti- misation of grinding and flotation circuits. In Proceedings of the 12th AusIMM Mill Operators’ Conference 2014. Melbourne, Victoria: Australasian Institute of Mining and Metallurgy.